top of page
Welcome
Design
Photography
Events & Essays
Portrait
Street
Nature & Wildlife
Product
About
Contact
More
Use tab to navigate through the menu items.
dean@informationdesign.com.au
CARTOGRAPHY (COMMUNICATIONS MAPPING)
VIDEOgraphy, animation and compositing
publishing and print
Play Video
Play Video
01:33
TMRQld
Smithfield Bypass flyover
A drone flyover of the Smithfield Bypass
Play Video
Play Video
00:38
TMRQld
K2A Rapid Impact Compaction
RIC is an acronym that stands for Rapid Impact Compaction. It involves a machine, an excavator, a 50 tonne excavator, that has a purpose-built attachment that undertakes what is called Rapid Impact Compaction. Its purpose is to, basically compact loose materials in the ground underneath where we are trying to build the road. The design for the site and, based on the fact that we are building on an old landfill site, requires that we undertake RIC at about 2 metre centres. It's not a common construction technique and in fact this is a first for Cairns. This type of equipment and machinery has not been in this region before.
Play Video
Play Video
Transport and Main Roads
Harley Street Animated Flyover
Animation and motion graphic: Dean Haynes Graphic design: Dean Haynes
Play Video
Play Video
02:36
TMRQld
Bruce Highway–Cairns Southern Access Corridor–Stage 3: Edmonton to Gordonvale project flyover video
Fly over of the Bruce Highway, Cairns Southern Access Corridor. More information and transcript available at https://www.tmr.qld.gov.au/cairnsbrucehighwaystage3
Play Video
Play Video
00:16
TMRQld
Smithfield Bypass Bridge Piling Timelapse
Play Video
Play Video
Transport and Main Roads
Smithfield Bypass Piling Works
Piling works at McGregor Rd roundabout at the northern end of the Smithfield Bypass Project
Play Video
Play Video
Transport and Main Roads
Gillies Range Road Truck Recovery Stage 2
Videography: Dean Haynes
Play Video
Play Video
Transport and Main Roads
Gillies Range Road Truck Recovery Stage 1
Videography: Dean Haynes Editing: Dean Haynes
Play Video
Play Video
00:28
TMRQld
K2A Liners Installation Timelapse
This is a 30-tonne excavator. With a vibrating head attachment. The steel pipes are driven down 4 metres. They reserve space for bridge supports.
Play Video
Play Video
01:09
TMRQld
Captain Cook Highway – Smithfield Bypass Project flyover animation
Captain Cook Highway – Smithfield Bypass Project flyover animation
Play Video
Play Video
01:10
TMRQld
Engineers Australia Video
Bruce Highway – Cairns Southern Access Corridor – Stage 4: Kate Street to Aumuller Street Project Engineers Australia site visit Members visited for an information sharing and networking opportunity They discussed Rapid Impact Compaction and wick drains, ground surface treatments Wick drains are installed to speed up ground settlement Wick drains allow water to rise under the weight of surcharge material Visitors were provided with up close explanations Rapid Impact Compaction (RIC) method Compressing an old landfill site A 7-tonne hammer strikes a 1.5m plate Site visits facilitate understanding of major construction projects and support industry development
bottom of page